Optimisation of building energy rehabilitation processes based on BIM-BEM interoperability: Case study of prefabricated panels with 3D printing

Authors

Evgenii Ermolenko, ; Bruno Figueiredo, ; Manuela Almeida, ; Lucas Lopes, ; Miguel Azenha,

Downloads

Published

May 7, 2024

Series

Categories

License

Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

How to Cite

Ermolenko, E., Figueiredo, B., Almeida, M., & Lopes, L. (2024). Optimisation of building energy rehabilitation processes based on BIM-BEM interoperability: Case study of prefabricated panels with 3D printing. In A. A. Costa & M. Azenha (Eds.), & (Ed.), 5º Congresso Português de Building Information Modelling Volume 2. UMinho Editora. https://doi.org/10.21814/uminho.ed.164.23